Footpath Handrail/ Railing SS 304 Grade:
Working Volume:
Location:
Foundation work: Layout, Earth Excavation & Backfilling, Polythene Laying, Rebar Fabrication & Setting, Shutter Setting, Concrete Casting. Foundation drilling and inserting 4 nos.
Reber with epoxy, Ms base plate setting (125x125x6mm)
Railing work: Supply, fitting & fixing SS Handrail (SS-304 Grade) dia 50mm-2mm thick top rail, dia 32mm-2mm thick 2 nos. horizontal pipe, dia 20mm-1.5mm thick vertical pipe @ 100mm c/c with support of 75mm-12mm thick flat bar. SS Handrail setting, welding, cleaning, polishing etc. with necessary accessories and arrangement.